摘要:地铁换乘站一经建成,站内各种换乘设施、换乘方式等都已基本确定,无法进行大规模改建。分析成都地铁线网客流、换乘客流、乘客行为特征;研究乘客换乘过程,梳理换乘流线;建立地铁网络换乘效率评价指标体系。通过成都地铁火车南站实例研究,分析乘客换乘流线,出存在问题并提出解决措施。 三亚亚特兰蒂斯水世界门票
大理圣托里尼旅游攻略 Abstract: Once the subway interchange station is completed, various transfer facilities and transfer modes in the station have been basically determined, therefore large-scale reconstruction is impossible. This paper analyzed the passenger flow, passenger behavior characteristics of Chengdu metro; studied the passenger transfer process, combed the transfer stream line; and then established the subway network transfer efficiency evaluation index system. Through the case study of Chengdu Metro South Railway Station, it analyzed the passenger transfer streamline, found out the problems, of which then proposed solutions.